{"id":281,"date":"2025-02-22T13:18:47","date_gmt":"2025-02-22T13:18:47","guid":{"rendered":"https:\/\/levantpandi.com\/?page_id=281"},"modified":"2025-02-22T14:19:22","modified_gmt":"2025-02-22T14:19:22","slug":"survey","status":"publish","type":"page","link":"https:\/\/levantpandi.com\/index.php\/survey\/","title":{"rendered":"Survey"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">It is crucial\u00a0for the Levant P&amp;I to ensure that any entered vessel meet the necessary standards for managing the quality of entered tonnage and in line with this, we request the assured to arrange P&amp;I Condition Survey by a surveyor on our approved list within 30 to 60 days of entry, depending upon the terms of the cover established by our underwriters.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Levant P&amp;I may at any time, or following an incident which will or may cause the assured to incur liabilities for which he may be insured by us, appoint a surveyor to inspect the assured\u2019s ship at a time and place acceptable to the parties. The surveyor will conduct a comprehensive survey to ascertain the physical condition of the vessel and the effectiveness of the onboard management. If deficiencies are found, the surveyor will provide the Master and\/or owners\u2019 representative with a list of items in need of rectification. The surveyor will also forward a copy of the list to the Levant P&amp;I with his initial report and if repairs are necessary, the Levant P&amp;I may require a follow-up survey once they have been completed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Technical Department may recommend the Underwriting Department to warrant a defect exclusion clause. Defect exclusions remain in effect until such time as the vessel passes the survey requirement either by successfully undergoing a complete P&amp;I Condition Survey, or following &nbsp;a survey in which outstanding deficiencies are found, is presented for and completes a Follow-up Survey satisfactorily.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>It is crucial\u00a0for the Levant P&amp;I to ensure that any entered vessel meet the necessary standards for managing the quality of entered tonnage and in line with this, we request the assured to arrange P&amp;I Condition Survey by a surveyor on our approved list within 30 to 60 days of entry, depending upon the terms [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"saved_in_kubio":false,"footnotes":""},"class_list":["post-281","page","type-page","status-publish","hentry"],"kubio_ai_page_context":{"short_desc":"","purpose":"general"},"_links":{"self":[{"href":"https:\/\/levantpandi.com\/index.php\/wp-json\/wp\/v2\/pages\/281","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/levantpandi.com\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/levantpandi.com\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/levantpandi.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/levantpandi.com\/index.php\/wp-json\/wp\/v2\/comments?post=281"}],"version-history":[{"count":2,"href":"https:\/\/levantpandi.com\/index.php\/wp-json\/wp\/v2\/pages\/281\/revisions"}],"predecessor-version":[{"id":351,"href":"https:\/\/levantpandi.com\/index.php\/wp-json\/wp\/v2\/pages\/281\/revisions\/351"}],"wp:attachment":[{"href":"https:\/\/levantpandi.com\/index.php\/wp-json\/wp\/v2\/media?parent=281"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}